Photovoltaic power plant with a grant Nová zelená úsporám

Consider the reality ...

Consumption of energy, especially electricity, is growing worldwide ...

Stocks fossil sources are reduced ...

 

Why buy a photovoltaic plant

Sunsidy

Since 1. 1. 2016 can apply for a subsidy for photovoltaic power plant, with the aid amount may reach 100 000 CZK per house. The first time is indefinite, the subsidy may be required on an ongoing basis until the end of the year 2021.

The money will be released gradually intothe program based on proceeds from the sale of emission allowances. More here.

Independence

Properly chosen plant size, combined with power management and storage of energy self-sufficiency strengthen your home. Avoid events such as blackout, ie. Both planned and unexpected network outages, downtime due to a fault.

Cost savings

Reduce monthly energy costs. Photovoltaic quarantees low operating costs, the fuel is free.

Price stability

Stabilize electricity costs for at least the next 20-30 years. We assume that the energy prices will rise in the future.

Maintenance-free operation

Solar panels do not need to be cleaned. By itself it is maintenance-free technology. Photovoltaic power consumes no raw materials for this operation uses only solar energy. Automatic operation requires no servicing..

Peace

Photovoltaic produces no noise.

Ecology

Take advantage of alternative sources of energy without polluting the environment. You become part of a community of people who care about the future. Photovoltaic power produces no CO2 or greenhouse gases, produces no emissions and has no negative impact on the environment.

Real estate appreciation

Photovoltaic power plant increases the value of the building.

Competitive advantage

In addition to energy savings in their own consumption and stabilize energy prices as for traders working from home during the events of the type blackout own energy source competitive advantage, which can not be quantified. You earn, you are producing, you create, competitors do not..

Prestige

Having your own photovoltaics today is simply "IN".

 

Why choose Eltosstav

Warranty networking

Turnkey project

We handle all documents

We have a professional team with years of eperience

We work with reputable world suppliers of high quality and proven technology

We will prepare the project directly tailored to each client we have an individual approach

We have experiences - photovoltaics is one of our branches for many years

Seamless service

Long-term guarantee

 

                                                          

                                                          

                                                                   "Our customers install on their homes only

                                                                    technology that would have put himself into his home" ...

                                                                                                  Jiří Štolpa

                                                                                                                          Managing Director

                                                                                                                          Eltosstav s.r.o.


 

 

Reference

Over the years in the market, we implemented a number of projects as the construction of photovoltaic power plants have rich experience. Overall, there were 45 succesfully realized a photovoltaic power ratings from 5 kWp to 3,5 MWp.

FVE School Prosimerice 30 kWp

FVE Hotel Happy Star 18,5 kWp and 30 kWp

FVE Jednota Moravsky Krumlov 29,76 kWp

 

Other realized contracts in the menu reference: 2015, 2014, 2013, 2012, 2011, 2010, 2009, 2008, 2007, 2006, 2005,

 

Implementation phase

Technical analysis, price offer

Engineering activities

Realization, revision

Connection to the grid

Handover

 

What we offer

Technology:

  • Photovoltaic panels
  • Cabling
  • Fastened to the structure
  • Storage reservoir for energy storage water heater
  • Battery
  • Converters (inverters)
  • Supportive and protective devices (overvoltage and undervoltage protection, etc.)

 

Optional accessories:

  • Power management
  • Monitoring the functionality and performance of photovoltaic power plants

 

Engineering activities:

  • Project dokumentation in accordance with the requirements ofcurrent legislationktová dokumentace v souladu s požadavky platné legislativy
  • Energy assessment
  • Settlement subsidy
  • Consent settlement construction office
  • License
  • Registration in the system OTE
  • Grid connection

 

Another services:

  • Counseling
  • Assembly, including transportation
  • Staff training and recommendations to the optional mode of operation
  • Wiring and commissioning
  • Revision

 

Queries

  • Who can apply for funds from the program Nova zelena usporam?
    Eligible applicants and beneficiaries are owners and builders of houses. May they be natural or legal persons.
  • When can I apply for a grant Nová zelená úsporám?
    It is possible to apply before, during or after the completion of the supported actions.
  • From when it is possible to apply for a grant to connecting to the power grid?
    The system must be connected to the grid. Support is granted only to systems connected to the grid after 1.1.2016.
  • The relevant date for determining the aligibility ofexpenditure?
    The allowance can be claimed retroactively, the relevant date for determining the eligibility of expenditure is max. 9 months prior to the  date of registration of the application (Support Area C).
  • How many times may I apply?
    Onne house can be claimed only one application, that it may contain a combination of several areas of support
  • How long does it take to process a grant?
    From applying to the payment of subsidies will pass up to 9 weeks. The condition is perfect application for the subsidy. Approval of the application will take about three weeks, as long ČFŽP will chceck the application and calculate the amount of the subsidy is also a three-week deadline for the payment of money.
  • What is the return on investment?
    The return cost is 7 to 12 years depending on the size of installed capacity, the amount of subsidies, own consumption. For competition is often return extends even further due to the use of poor quality materials with low lifetime.
  • How much can I get a grant?
    Supported the installation of photovoltaic systems is finished houses and new constructions, while the amount of aid can reach up to CZK 100 000 per house/supply point.
  • On how much power I get a grant?
    The maximum installed capacity of the system must not be higher than 10 kWp
    The minimum installed capacity is determined directly, but the volume of energy used. This can be archieved in practise a system of minimum output .
  • It can connect power without the consent of the grid?
    Not yet. However, it is preparing a decree that will allow this.
  • What is the life of a photovoltaic plant?
    Power output is guaranteed 25 years, the life of the system is expected to 30 years
  • How much space will take up panels?
    1 kW takes about 7 m2 (sloped) roofs. Current RD may have a roof 3-7 kW. For flat roofs, the panels are installed in rows, and it is necessary to ensure that the number of cast a shadow one another. Footprint can be a little bigger..
  • What is the delivery date?
    The entire process takes about 2-3 months.
  • What is the optimum orientation of the solar panels?
    In the annual total produced most when they are aligned exactly to the south.Focus on south-west or south-east represents about 5% loss of production (quite bearable). For optimum orientation of the panels it can be considered anything from the southeast along the southwest. Direction exactly to the west or the east means a loss of about 20%.
  • What is the optimal slope of the panels?
    At our latitude of about 35°

 

Contact Us